Powered for Patients is proud to be working with the Florida Hospital Association (FHA) on a comprehensive emergency power resilience initiative that will help bolster emergency power reliability for Florida’s hospitals. The FHA-P4P initiative will evaluate current protocols for emergency power threat reporting by hospitals and review response plans by local, county and state agencies, and utilities when hospitals face a threat to emergency power during an outage. This review will help identify any gaps that can be closed with enhanced threat reporting and response protocols or through stepped up coordination among FHA, hospitals, government agencies and utilities.
The project will also include a confidential census of hospital emergency power systems to give FHA a clearer picture of the emergency power capabilities and vulnerabilities among the state’s hospitals. Identifying hospitals with emergency power vulnerabilities, including reliance on a single generator, use of outdated generators or limited onsite fuel storage capacity, will enable FHA to help these facilities develop contingency plans with government agencies and utilities to better address an emergency power threat.
The recent impact of Hurricane Isaias, which made landfall along the Florida Panhandle and caused widespread power outages, is a fresh reminder of the importance of safeguarding hospital emergency power before, during and after power outages. The FHA-P4P initiative will include the publication and distribution of Florida’s Emergency Power Resilience Playbook, which will introduce any new protocols developed as part of the project along with best practices to help facilities safeguard emergency power. The Playbook will be modeled after earlier Playbook editions produced by P4P for the LA County EMS Agency and the RI Emergency Management Agency.
The initiative will include a webinar series to provide expert tips and training resources for hospital facility directors and engineering staff. FHA and P4P will also assess opportunities to leverage government funding to deploy quick connect devices and Fault Detection & Diagnostic (FDD) equipment in single generator hospitals. The 7th edition of the Florida Building Code, which took effect in December 2020, requires quick connect devices for newly built hospitals that operate with a single generator. Quick connects allow rapid connection of a temporary generator to replace a failed generator or to provide back up power when a facility’s only generator is offline for maintenance. Quick connect devices are not required for single-generator hospitals built before the 2020 change to the Florida Building Code. Fault Detection & Diagnostic (FDD) equipment installed on an emergency power system acts like a heart monitor on a patient, and enables real time, automated notification of designated individuals anytime emergency power kicks on or experiences a problem while operating. Organizations interested in taking part in the FHA-P4P emergency power resilience initiative can contact P4P project director Eric Cote at cote@poweredforpatients.org.
